New warehouse on our site in Sopron

New warehouse on our site in Sopron Principal: Own investmentProject: Construction of 1100 m2 warehouse with prefabricated reinforced concrete frame structure, sandwich panel facade; ventilated. ANY QUESTIONS? CONTACT SOPRON  Telefon +36 99 513 290 ...

New incubation house for small businesses in Sopron

New incubation house for small businesses in Sopron Principal: Sopron Holding Vagyonkezelő ZrtProject: FÉSZ-STETTIN consortium1979 m2 reinforced concrete frame industrial hall – with 16 workshop units, sandwich panel siding, trapezoidal sheet insulated roofing,...

Renewal hydroelectric power plant, Alsószölnök

Renewal hydroelectric power plant, Alsószölnök Principal: Jank Magyarország Kft Project: The hydropower plant built in the 1980s on the Austrian-Hungarian border on the Raab was renovated on behalf of the Austrian owner in order to increase capacity. The prerequisite...

High-bay warehouse, Szada

High-bay warehouse, Szada Principal: Ober Lízing Kft Project: The high-bay warehouse was built at the Mondi Szada Kft site as an extension of the existing plant. The main features of the high-rise building: foundation with drilled pile foundations, base of monolithic...

MTD warehouse, Nemesvámos

MTD warehouse, Nemesvámos Principal: MTD Hungária Kft Project: Construction of a warehouse, main features: precast reinforced concrete building frame on reinforced concrete point foundations with steel reinforcements, steel-reinforced Kingspan IPN-filled sandwich...

STETTIN-HUNGARIA formwork production hall

STETTIN-HUNGARIA formwork production hall Principal: Own investment Project: Due to the expansion and development of the production capacity, the existing 551 m2 hall was expanded. The new hall was built as a continuation of the existing hall with the same span and...